Drainage was installed on 10 to inprove the growing conditions and allow for better playability.

Staff cuts and removes the sod before trenching so it can later be used after the drain pipe is installed.

2-3 inches of gravel is installed below the slotted pipe and on top of the pipe to create greater and faster water infiltration rates.


After gravel has been installed, sand and the sod is replaced back over the pipe. This helps to speed recovering and prevent the sand and gravel from washing out

After the sod is late some more TLC and rain or irrigation water is used to remove any excess dirt or mud clogs.

Pretty good post. I just stumbled upon your blog and wanted to say that I have really enjoyed reading your blog posts. Any way I'll be subscribing to your feed and I hope you post again soon. Please check link webstagram
ReplyDelete