Foundry

Foundry

Thursday, February 5, 2015

Drainage to the Fairway at 8

Adding a catch basin at the top of the hill along with several laterial drains to help eleviate wet condition at the junction of the fairway and the approach to #8 green surround. 

Adding gravel and drainage pipe in the landing area of #8 fairway.



No comments:

Post a Comment