Drainage #2

Drainage has been added to the landing areas at #2 fairway.  This will be a big improvement.
Sod is cut off and the trench was dug to 15-18 inches 
Pipe was installed and gravel was added back to the trench
Jairo is laying the sod back over the trench to stabilize the gravel until spring arrives
Just some minor cleanup is left