Thursday, February 27, 2014

Reconfigured 16 creek/pond

The retaining pond and waterfall feature on 16 has been leaking over the last two years and has required continual maintenance to keep it working properly.  We decide to reconstruct the pond to hold less water so the daily refilling would be reduced and to allow for the waterfall feature to work more appropriately.  Although it is reduced in size it will still find plenty of golf balls that get to close.  The staff did a great job with reconfiguring this feature


The collection pond before we tore it apart

The staff is draining the pond

The staff has added over 20 small dump truck loads of fill dirt to shape the new pond

William is adjusting some of the new boulders that we have added

The pond after it has been filled with water