Drainage #8


We have started the drainage on 8 fairway.  Since this is in the middle of the fairway and at the bottom of the slope I decided we would sod cut the area before trenching and adding drainage pipe.  After the pipe has been installed the sod can be laid back over the trench which will help prevent the sand from washing out of the trenches.  We will add another 750 ft of drainage to the second part of the fairway as weather permits 
Removing sod and trenching

Adding pipe and gravel to the trenches
The pipe has been installed and the sod has been laid back over the trench to prevent sand from washing out. 