FOUNDRY TURF CARE DEPARTMENT
Foundry
Friday, January 17, 2014
Adding drainage behind 4 green
Adding drainage behind number 4 green and 5 teeing area. This area stays wet since the tee heads, perimeter heads and at times the green heads end up throwing water in this low low areas
Behind number 4 green after drainage wash installed
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment