Foundry

Foundry

Friday, January 17, 2014

Adding drainage behind 4 green

Adding drainage behind number 4 green and 5 teeing area.  This area stays wet since the tee heads, perimeter heads and at times the green heads end up throwing water in this low low areas

Behind number 4 green after drainage wash installed


No comments:

Post a Comment