The entryy and exit points at the foundry have started to erode over the last few years. We have decided to fix these areas by cutting the old asphalt out. We installed re bar and gravel to the areas that were torn out. We will be adding concrete that will be 6 inches thick.
 |
Re bar and gravel. Concrete will be added over top |
 |
Concrete is added |
 |
Field stone rocks are added for a better look |
No comments:
Post a Comment